Hit the high walls

Scaffold to reach top floor walls and gutteringFinally the scaffold is erected with all the bracing, stabilisers and platforms. There is a kickboard kit but I dont know that I will be bothered fitting it at this stage. Works a treat as is, makes reaching the walls and guttering on the high section easy. I washed Section 2 walls this morning (the “alcove” outside stairwell sliders and kitchen window), and hope to start cutting in later today, when that section is back in the shade.

Bottom left of picture is finished with top coat. White section is primer, and the rest is the old paint.

Categories

© Copyright

All information, content, code and graphics contained within this site, unless otherwise noted, are copyright Redback Graphics. Any Third Party information, content, code and graphics contained within this site is the property of its respective owners. No part may be reproduced by any process without the express permission of Redback Graphics.